| The bridge piers for the construction of the highway in the Port of Adelaide was proving a major problem. The AZ36 sheet piles installed by the Abigroup subcontractor were proving to leak badly. Hence, ESC was approached to design a sheet pile to meet the watertight requirements and maintain the structural requirements of the Cofferdam.
ESC designed and supplied the ESC 36 BP S 355 sheet pile in 17 metre lengths. The clutches of the BP sheet pile were grouted providing a 100% water proof sheet pile Cofferdam. Abigroup saved not only money but time with the ESC design.
| Project Details: |
| Client |
Adelaide Port River Expressway |
| Main Contractor |
Abigroup Australia |
| Supplier |
ESC |
| Sheet Pile Tonnage |
240 tons |
|

|