ESC Projects (M) Sdn. Bhd. was employed to provide structural design of temporary sheet pile wall (complete with strutting and tie back system), supply and installation works. The construction works placed in 13 culverts whereby sheet pile wall was required to secure the railway track during the reconstruction of new culverts. Sheet piles were supplied in 4.0m to 12.0m lengths and driven to the clayey silt ground conditions. The construction works was in two phases which begin in August, 2002 and end in August, 2004.
| Project Details: |
| Client |
Keretapi Tanah Melayu Berhad |
| Implemented By |
DRB Hicom Bhd |
| Main Contractor |
Spegabina Sdn Bhd |
| Specialist Sub Contractor |
ESC Projects (M) Sdn Bhd |
| Sheet Pile Supplier |
Earth Support Company Sdn Bhd |
| Sheet Pile Tonnage |
174 MT |
| Strutting Tonnage |
122 MT |
|

|