Ahmad Zaki Sdn Bhd had contracted ESC Projects (M) Sdn Bhd for the supply and installation of light sheet piles to serve as scour protection upstream and downstream of the ongoing bridge project. ESC have successfully supplied and installed the 6.0m lengths ESC 6B S275 JRC sheet piles. Though the job was small, ESC is always committed to come to a party to meet the client demand.
Apart from site constraint, the actual sheet pile work was completed within 2 working days. The work was completed in April 2007.
| Project Details: |
| Client |
Jabatan Kerja Raya Malaysia |
| Main Contractor |
Ahmad Zaki Sdn Bhd |
| Specialist Sub Contractor |
ESC Projects (M) Sdn Bhd |
| Sheet Pile Type |
ESC 6B S275 JRC in 6.0m lengths |
| Sheet Pile Quantity |
12 tons |
|