Past Projects MARA BUILDING (PERMANENT SHEET PILE BASEMENT WALL) - Terengganu - Malaysia
 

Due to the close proximity to the adjacent building, a permanent sheet pile basement wall was proposed as part of a single story basement car park for MARA building in Kuala Terengganu, Terengganu.

9.0m length ESC 12B sheet piles were used in this project. Angle steel bar strips were welded at the floor base to act as water stops as well as starter bars for the ground floor reinforcement bars. A permanent paint was applied after the installation to provide corrosion protection as well as excellent wall finish.

The project was completed in early 2006.

Project Details:
Client Majlis Amanah Rakyat (MARA), Malaysia
Main Contractor BS Mutiara Engineering Sdn Bhd
Sheet Pile Type ESC 12B S275 JRC in 9.0m length
Sheet Pile Quantity 63 tons

Sheet pile installation in progress.

ESC Sheet Piles already installed.


Pouring of Concrete Slab.
 
     

 