Past Projects NANYANG POND (FLOOD MITIGATION PROJECT) - Kuala Lumpur - Malaysia
 

Strengthening and enlargement of Nanyang Pond was part of the Kuala Lumpur Flood Mitigation Project, Package B which was awarded to PECD Berhad. ESC has been the main supplier of steel sheet piles with scope of work included supply and installation. Here ESC sheet piles were installed and then a concrete façade wall was constructed in front of the sheet piles as part of the Engineers Design.

The project was completed in February 2005.

Project Details:
Client Jabatan Pengairan dan Saliran Malaysia
Main Contractor PECD Berhad
Sheet Pile Type ESC 20A S275 JRC in 12.0m lengths
Sheet Pile Quantity 342 tons


ESC 20A sheet piles being installed on site.


Construction on concrete facade wall in progress.


Completed Sheet Pile Wall with Facade and Capping Beam.
 
     

 