New culverts were constructed by the main contractor to channel water to a huge water retention pond. A sheet pile wall was required to protect embankment along the pond and also as water cut-off to prevent flooding to the adjacent residential area.
ESC Projects (M) Sdn. Bhd. was commissioned to supply and construct sheet pile wall with the length of 4m up to 16m. Sheet piles were driven to the firm silt ground conditions using 5 ton hydraulic drop hammer.
| Project Details: |
| Client |
Sime UEP Bhd |
| Main Contractor |
R & W Management Sdn Bhd |
| Specialist Sub Contractor |
ESC Projects (M) Sdn Bhd |
| Sheet Pile Supplier |
Earth Support Company Sdn Bhd |
| Sheet Pile Tonnage |
214 MT |
|