top of page

Hinkley Point C Nuclear Power Station - Temporary Jetty Pipe Piles


Hinkley Point C Nuclear Power Station

ESC Steel Structures alongside Edgen Murray Europe fabricated pipe piles for a temporary jetty for the Hinkley Point C Nuclear Power Station in the United Kingdom. Besides the forming of the pipe, the scope of works included: padeyes, shear rings and multi-level grouting pipes. See the project writeup at: http://www.escsteelstructures.com/temporary-jetty-piles


78 views
bottom of page